Turn a product requirement into a technical scope the team can estimate and sequence. ACW defines system boundaries, investigates dependencies, and records the assumptions behind the implementation plan.

See discovery outputsContact Us

Resolve the questions that change a delivery estimate

  • Requirements leave important behavior undefined

    Screens and feature names do not establish every role, business rule, or exception. Define the critical scenarios before treating a scope as ready for implementation.

  • Dependencies sit outside the product

    External APIs, data access, existing systems, and approvals can affect the order of work. Identify who controls them and what needs verifying.

  • There is no agreed build sequence

    Some capabilities depend on earlier decisions or components. Map that order so estimates reflect the work and the conditions required to start it.

Develop the technical plan around the selected scope

  • Scope definition

    Translate product needs into requirements, system boundaries, critical flows, and explicit exclusions. Record questions that need a business or technical decision.

  • Architecture outline

    Describe the main components and their responsibilities. Connect the proposed approach to integration, performance, access, and operational requirements.

  • Dependency mapping

    Identify external services, data sources, environments, and access needed for delivery. Assign owners to checks and dependencies that are not yet resolved.

  • Delivery roadmap

    Arrange the work into stages, accounting for dependencies and validation needs. State the assumptions and uncertainty behind estimates rather than presenting a provisional sequence as a fixed commitment.

Give the delivery team a basis for estimation

  • Requirements and boundaries describe what the selected release must do, the relevant scenarios, and what is excluded.

  • An architecture and integration outline records the system structure, interfaces, and dependencies reviewed.

  • A delivery plan with estimation assumptions shows the proposed sequence, unresolved decisions, and checks needed before later stages.

These outputs support a scope and estimate review with the people responsible for implementation.

Investigate the uncertainties before finalizing the plan

Discovery begins with the product objective, available designs or specifications, and discussions with business and technical owners. We examine the critical flows and the requirements that could change the architecture or effort.

The agreed scope may include a targeted technical check where documentation cannot answer an important question. Findings feed into the architecture outline and delivery sequence, followed by a review of remaining risks and assumptions.

Agree what discovery needs to establish

Define the release or product area in scope, required access, participants, and expected outputs. Acceptance checks that the agreed requirements, boundaries, architecture, dependencies, and estimation assumptions are reviewable together.

Discovery can identify uncertainty without eliminating it. A dependency that cannot yet be tested should have a stated effect on the plan and a decision owner. Detailed production design or implementation is included only when specified.

Illustrative example

Illustrative example: scope a supplier portal

A supplier portal needs access roles, document uploads, approval steps, and a connection to an existing business system. Discovery would define the user flows and rules, review the available interface, and sequence the work around integration access. Any unavailable interface would remain an explicit dependency in the estimate.

Questions about technical discovery

Can we start with designs rather than a specification?

Yes. Designs help explain the intended experience. Discovery still needs to establish the rules, exceptions, integrations, and operational requirements behind the screens.

What if an external integration is undocumented?

The scope can include investigation where access is available. If verification is blocked, the plan records the unknowns, owner, and implications for implementation.

Does discovery guarantee the final delivery cost?

No. It provides the scope and assumptions for estimation. Commitments depend on the agreed requirements, evidence available, dependencies, and delivery arrangement.

Resolve product and technical choices alongside the scope

Bring the product scope that needs a technical plan

Share the requirements or designs, known integrations, and decisions that could affect delivery.