Contract logic
Define inputs, conditions, state transitions, and the result expected for each supported function.
Turn defined product rules into contract functions and state changes. Establish who can act, which conditions must hold, and how the contract is tested and approved for the intended deployment.
See the contract scopeContact UsContract requirements need to cover expected actions, invalid inputs, unauthorized calls, and interactions with other components. A successful example alone does not establish how the system behaves outside that scenario.
Deployment also changes how corrections can be handled. Ethereum’s security guidance explains why deployed contract logic requires careful assessment and why testing alone cannot establish the absence of vulnerabilities.
The agreed outputs can include a contract behavior specification, permission model, implemented code, test scenarios and results, and deployment instructions. Documentation identifies the configuration, administrative responsibilities, and known limitations relevant to operation.
Acceptance reviews the implemented behavior against the specified scenarios. It does not turn a reviewed contract into a guarantee against defects or exploitation.
We clarify the rules and dependencies, review the proposed contract structure, and implement the selected scope. Tests examine the expected and rejected actions included in the requirements.
A release review records test findings, unresolved risks, required independent review, and deployment authority. Production keys and operation remain with the owners identified in the engagement.
Specify the target network, contract interfaces, supported actions, test requirements, and release materials. Independent audits, formal verification, existing-contract remediation, and ongoing monitoring require explicit scope.
Illustrative example
A product requires tokens to be issued only by designated administrators and within a defined limit. The specification would state the permitted roles, issuance conditions, rejected actions, and authority-transfer process. Tests would examine those rules before the project’s deployment review.
That depends on its architecture. An upgrade or pause capability must be designed and governed explicitly; it should not be assumed to exist after launch.
The permission model identifies the authorized accounts and how those responsibilities are managed. The client and implementation team agree this before deployment.
No. They provide different forms of review. Any independent audit and the handling of its findings must be specified in the release plan.
Describe the actions, permissions, assets, and deployment constraints.